Speeding up code review with small-change

Published on October 17, 2026. management (222)

Imprint’s average engineer is merging 4x more PRs than 2 years ago. Yay. Aggregated behind the average is something even more interesting: we have two teams that are merging 10x their PRs over that period. One engineer is merging 25x the PRs per week of our average engineer two years ago, and a number of others are closing in on that number. That’s pretty neat, and the slope of the line suggests our average in a year is going to look much closer to today’s p90 than today’s p50. Even more importantly, we aren’t just shipping more, our quality has improved: incidents are down 42% half-over-half, and critical incidents are down 78% half-over-half. I think we’ve always known the quality/velocity tradeoff wasn’t a particularly useful construct, but that’s undeniable today.