title: "The geometric model of maintenance"
slug: the-geometric-model-of-maintenance
url: https://listedarticles.com/articles/the-geometric-model-of-maintenance
canonical_url: https://entropicthoughts.com/geometric-model-of-maintenance
content_type: research
language: en
published_at: 2026-10-13T00:00:00.000Z
updated_at: 2026-10-15T14:19:01.056Z
author: "kqr"
authored_by: human
publisher: "Entropic Thoughts"
publisher_url: https://entropicthoughts.com/
topics: ["Software Engineering", "Statistics", "Programming"]
license: all-rights-reserved
word_count: 2827
reading_minutes: 12
citation: "kqr, Entropic Thoughts. \"The geometric model of maintenance.\" 13 Oct 2026. https://entropicthoughts.com/geometric-model-of-maintenance (all-rights-reserved)"
# The full text follows. The web page shows an extract and sends readers
# to the source above; quote the citation and link the canonical URL.
---

# The geometric model of maintenance

> Using git history labelled as new development or maintenance, kqr tests James Shore's rule that each person-month of code induces 10 days of maintenance in year one and 5 days a year after, finds it does not track real projects like tmux, and proposes a geometrically decaying model whose fitted totals range from about 1.5x maintenance per unit of new work for nginx to 5.3x for Neovim.

James Shore posits that [each person-month spent writing code results in 10 days
of maintenance](https://www.jamesshore.com/v2/blog/2026/you-need-ai-that-reduces-your-maintenance-costs) in the first year, then 5 days every year after that. Naïvely
interpreted, this is a *threshold*-based model for induced maintenance, and its
interesting because it’s so simple.

If it could be shown to be true, that’d be useful. The argument Shore is
making about the effects of robot-generated code does not depend on the specific
numbers, so Shore’s numbers come from a hypothetical wisdom-of-the-crowds
aggregation rather than concrete data. But no hypotheticals are necessary here.
We have a thing called git.

# Testing the threshold model of maintenance

Let’s say [we have a way of labeling each commit](https://entropicthoughts.com/cheaper-llm-labeling) as either “new development” or
“maintenance”. Then we can count how many commits of each type there are in a
month.[1] Possibly better, we can count [how much
complexity has been handled](https://entropicthoughts.com/lines-of-code) in a month.[2]

The following plot shows the cumulative effort that has gone into the
development of tmux since its beginning to the day I start writing this article.

![induced-maintenance-demand-01.svg](https://entropicthoughts.com/image/induced-maintenance-demand-01.svg)

We will look first at the black curve, which represents effort spent adding
features to tmux. From left to right:

- In the first month of the repository, a few thousand lines of feature work are
  present almost from the start.
- From the start in 2008 to 2010, tmux saw rather intense activity at
  around 30,000 lines of new development effort per year.
- Then new development slowed down, and between 2010 and 2026, it happened at a
  fairly steady pace of 8,000 lines of effort per year.
- As of today, tmux stands at just over 230,000 lines of effort of new
  development that have happened throughout its history.

To see how much effort has been spent on maintenance, we perform the same
exercise but with the red curve instead.

- Maintenance started dipping behind new development early on, but then traced
  fairly closely to new development between 2008 and 2014.
- After that, maintenance took off at a rate of 30,000 lines of effort per year,
  continuing at that pace until 2022.
- Then it slowed down again to around 10,000 lines of effort per year.
- As of today, tmux has required around 430,000 lines of effort for maintenance.

In other words, of the total roughly 660,000 lines of effort spent on tmux, only
about a third has been on new development. This has changed over time, and we
can find roughly four regimes in the project’s history.

- 2008–2010: Total effort is 60,000 lines per year. About 50 % of that is maintenance.
- 2010–2014: Total effort is 16,000 lines per year. About 50 % of that is
  maintenance.
- 2014–2022: Total effort is 38,000 lines per year. About 80 % of that is
  maintenance.
- 2022–2026: Total effort is 18,000 lines per year. About 55 % of that is
  maintenance.

This is not quite the continuous increase of maintenance fraction predicted by
the threshold model. To be sure, we should also check visually. The prediction
of the threshold model is represented by the dotted red line.[3]

![induced-maintenance-demand-02.svg](https://entropicthoughts.com/image/induced-maintenance-demand-02.svg)

All the way from 2008 to 2022, the simple threshold model does actually fairly
closely predict the amount of maintenance tmux has required. But the exponential
nature of the threshold model means its prediction eventually goes up faster
than actual maintenance performed.[4] This means the model fit will likely worsen as time goes on.

The threshold model is also not a great fit for some other projects, where it
generally overestimates the amount of maintenance performed. As one example,
maintenance work has made up 63 % of the effort spent on nginx to date, but the
threshold model suggests it should be 81 %. Other projects where the model
overestimates the maintenance requirements are Rust, VSCode, and Go.

In contrast, the model underestimates the amount of maintenance required for
Neovim. The Neovim project has been maintenance-heavy from the start, and
through its history, 83 % of the work on Neovim has been maintenance, but the
threshold model suggests it should be 70 %.

However, the more general problem with the threshold model is one of timing. This is
best illustrated with Syncthing.

![induced-maintenance-demand-03.svg](https://entropicthoughts.com/image/induced-maintenance-demand-03.svg)

The threshold model lands close to the correct lifetime maintenance fraction
here (70 % vs. the real 67 %) but it is nowhere near following the actual maintenance
curve.

An apologist could argue that the lack of curve-following is not because the
model is wrong, but because the Syncthing project is an outlier that decided to
front-load a bunch of maintenance. Unfortunately, Syncthing isn’t the only
project where this happens, and it’s actually a symptom of the big flaw of the
threshold model. Given a constant level of new feature development, it predicts
maintenance will grow exponentially.[5] That doesn’t seem to be what happens in practise in the
projects I’ve looked at.

# A geometric model

But maybe we can rescue the model by refining it. The original threshold model
says that the 100 lines of effort I spend on new development today contributes
at least 5 lines of maintenance effort per year until infinity. That’s probably
not true, in part because old code tends to be more stable, but also because
code is gradually rewritten, so the 100 lines I made today might not even be
around five years from now.

We can tweak the threshold model to account for this, by adopting a geometric
decay on the maintenance induced by new development. If we pick numbers
consistent with what Shore proposed, we’d say that maintenance starts at 5 % of
the work performed[6], and decays
with 3.6 % per month.[7] However, these numbers
would yield results very similar to what we’ve already seen: the maintenance
curve doesn’t track actual maintenance performed.

However, we can pick other numbers. For example, if maintenance starts at 4 % of
the work performed, and decays with 2.6 % per month, we get a maintenance curve
that tracks fairly closely to the new development curve. This happens to work
well for nginx, which is light on maintenance:

![induced-maintenance-demand-04.svg](https://entropicthoughts.com/image/induced-maintenance-demand-04.svg)

For a project that needs more maintenance, like tmux, the same numbers don’t
work. They produce a curve that underestimates the maintenance required.

![induced-maintenance-demand-05.svg](https://entropicthoughts.com/image/induced-maintenance-demand-05.svg)

We can ask our computer to pick out the numbers that produce the
optimally-fitting modified geometric curve for tmux. This happens at the same 4 %
initial value, but decaying with 1.4 % instead of 2.6 %. Here it is,
graphically:

![induced-maintenance-demand-06.svg](https://entropicthoughts.com/image/induced-maintenance-demand-06.svg)

If we continue to do this for all projects we have data for, we get a set of
numbers with large variation.

| Project | Up-front maintenance | Decay |
| --- | --- | --- |
| nginx | 4 % | 2.6 % |
| tmux | 4 % | 1.4 % |
| Neovim | 20 % | 3.8 % |
| Syncthing | 29 % | 14 % |
| React Native | 7 % | 3.2 % |
| Go | 3 % | 0.7 % |
| VSCode | 48 % | 19 % |
| Rust | 12 % | 3.6 % |

These numbers are not intended to tell us anything causal about how maintenance
comes to be. Rather, they’re the *just-so* numbers we are forced to pick to make
the geometric curve follow the actual maintenance performed closely, for each project.

We can take these numbers and extend the maintenance curve ten years into the
future, and predict how much maintenance will be needed in these projects even
if they completely stop all new development. Here’s nginx.

![induced-maintenance-demand-07.svg](https://entropicthoughts.com/image/induced-maintenance-demand-07.svg)

The curve illustrates that nginx is already fairly close to their current
maintenance saturation point, and rather little maintenance remains if they
freeze all new development now. We can contrast this with something like tmux,
which, when extended a decade forward, has a long way to go until their
maintenance curve plateaus.

![induced-maintenance-demand-08.svg](https://entropicthoughts.com/image/induced-maintenance-demand-08.svg)

Although it’s neat to be able to reproduce maintenance curves for projects, we
shouldn’t really project these curves into the future because that gives viewers
the idea that the curves are predictive, when in reality they should be thought
of as descriptive. But! These plots indicate that maybe there’s a more
human-friendly way to present the numbers, that say something more intuitive
about the projects.

# The geometric model to characterise projects

Here’s one way to interpret the numbers of the geometric model. With a
geometrically decaying series, the sum of all numbers is computed by dividing
the starting value by the decay factor. The sum, in this case, represents the
total amount of maintenance performed relative to the new development effort.

| Project | Total maintenance |
| --- | --- |
| nginx | 1.5× |
| Syncthing | 2.0× |
| React Native | 2.1× |
| VSCode | 2.5× |
| tmux | 2.6× |
| Rust | 3.2× |
| Go | 4.3× |
| Neovim | 5.3× |

This is *so interesting*. According to the geometric model, each hour of
new development on nginx produces 1.5 more hours of maintenance work over the
lifetime of the project. That is the lowest figure of these projects. It could
mean that

- The nginx developers only accept high-quality code, since it needs so little
  maintenance going forward, or
- nginx runs in fairly predictable environments where few assumptions can be
  incorrect, and thus few assumptions need to be revised.

The opposite on this spectrum might be something like Neovim, where each hour of
new development produces over five hours of maintenance over the lifetime of the
project. Neovim likely needs to adapt to a varied set of environments and
workflows, where all sorts of edge cases show up.

Isn’t this *such* a useful rule of thumb already? Now the developers of e.g.
tmux know that for every hour of new development they plan, they’ll have to
budget around 2.6 hours of maintenance. You can do this for your own
projects! Even if you haven’t fitted the curve to your project’s history (or you
don’t have a project history to fit to), it seems that 3 hours is somewhere in
the middle of the range, so you can assume three hours of maintenance per hour
of new development.

But when should you plan to do that maintenance? That’s another thing we can
query of the geometric model.

| Project | Elimination time |
| --- | --- |
| Syncthing | 2 years |
| VSCode | 2 years |
| nginx | 4 years |
| React Native | 5 years |
| Rust | 6 years |
| Neovim | 7 years |
| tmux | 8 years |
| Go | 13 years |

The amount of maintenance needed from new development shrinks over time, as bugs
in the code are ironed out. The *elimination time* in this table is the amount
of time it takes until a hundred lines of new development effort need less than
one line of maintenance work per month.

We can tell that some projects get through their maintenance fairly quickly
(Syncthing, VSCode), but for others it takes longer to find the bugs and sort
them out (tmux, Go). The average is six years.

This completes the planning guideline: if we start up a new project, for each
hour of new development we plan, we should budget for three hours of maintenance
spread out over six years, geometrically decaying. Here’s a handy table.

| New development planned: | 1 day | 1 week | 1 month |
| --- | --- | --- | --- |
| Maintenance same year | 10 hours | 6 days | 26 days |
| "         year 2 | 7 hours | 4 days | 18 days |
| "         year 3 | 5 hours | 3 days | 13 days |
| "         year 4 | 3 hours | 2 days | 9 days |
| "         year 5 | 2 hours | 1 day | 6 days |
| "         year 6 | 2 hours | 1 day | 4 days |

I’m actually surprised that in this average case, just the maintenance induced
*in the same year* as the original new development exceeds the new development
time. Thus a one-week project is not a one-week project, it’s a two-week project
even when it includes only maintenance performed in the same year. (It’s a
four-week project when considering all maintenance borne out of it.)

# Further development

While yes, I believe that table is better than nothing – and possibly better
than what many are doing today – the geometric model is not realistic. For
example, it says that one day of new development has the same elimination time
as a month of new development. It also does not account for the size of the
existing code; I would think adding more features to an already-big code base
should produce more maintenance than adding features to a small code base.

Another thing that bugs me about the geometric model is that the amount of
total maintenance produced by a unit of new development varies greatly across
projects, as does the elimination time. In order to use the geometric model
for planning, we should really fit those values for each project specifically,
rather than use these rough averages. These averages happen to work great for
projects like Rust, VSCode. They are pessimistic for projects like Go,
Syncthing, tmux, and nginx. And they still underestimate the maintenance
required for a project like Neovim.

I don’t think we’ll ever get a model of induced maintenance that is completely
free of estimation – some projects simply need more maintenance than others –
but perhaps we can get an slightly better fit? Perhaps we can find a model where
some parameters are stable across projects and don’t need re-estimation? That
would tell us something deeper about how software development works.

I have some ideas for how to go about this, but that’ll be another day.

# Acknowledgements

I am grateful to James Shore for reviewing a draft of this article. He had very
insightful suggestions for improvements. In particular, some of the detailed
sidenotes clarifying the methodology are entirely to his credit. As always,
mistakes are my own.

He also noted that my presentation of his application of the threshold model was
based on a flawed reading of the spreadsheet. To clarify, I must emphasise that
the primitive application of the model we use here – where all new development
adds an absolute level of maintenance – is not the model Shore presented, nor
the way he used it in his article.

The way Shore uses the model, he lets past new development drive both
maintenance and hypothetical new development, and we cannot do that, because we
already have the actual new development that happened. I would argue the
application in this article makes for a better test of general fit and validity,
but it says very little about the way Shore applies the model, which is in
completely different circumstances.

I strongly recommend reading his article series, and digging into the details of
the spreadsheet, if you’re curious about that.

# Notes

1. This article will assume that necessary maintenance gets performed,
   and if maintenance is not performed, that’s because it wasn’t strictly
   *necessary* from the aggregate users’ points of view. I know a lot of people
   would object to that assumption because maintenance they think of as necessary
   is not performed, but try to suspend your disbelief. If you keep using the
   software even when that thing is not getting fixed, how necessary is that thing
   *really* to keep you around as a user?
2. In this analysis, I am counting the
   gross commit size, i.e. additions plus deletions, as the amount of effort that
   went into the commit. One can argue that this is a bad measurement of effort,
   but it’s the best I have, and in my experience, on longer timescales like the
   ones we look at here, it’s not so bad.
3. Note that we
   are not using the threshold model to predict the *fraction* of maintenance here,
   but instead applying it primitively for what it says about the *absolute size*
   of the maintenance demand. In Shore’s original application, he was able to
   predict the fraction of maintenance through the threshold model, because the
   model was allowed to also determine the rate of new development (through a fixed
   monthly work rate.). We don’t do that, because we have the real new development
   rate of the tmux project. It wouldn’t make sense to impose on the data an
   assumed new development rate that we already know isn’t true.
4. If new development had been reduced to
   make room for the maintenance work, as Shore argues is the case for many
   corporate projects, then maintenance would have leveled off as new development
   grinds to a halt. But clearly, in the tmux case, new development does not reduce
   *that much* to make room for maintenance work. And the same is true for all
   projects I surveyed, including corporate-backed ones whose primary contributers
   are on a payroll.
5. Shore would argue that we cannot base
   our judgment on a constant level of new feature development because new features
   should slow down as maintenance takes over the total work effort. But in the
   projects I’ve looked at, new development seems to happen at a relatively
   constant level.
6. The reason the geometric model starts at 5 % rather than
   the 0.8/21.7=3.8 % the threshold model has is because the decay starts happening
   immediately, and proceeds monthly through the first year. Thus, the total
   maintenance the first year will still be 10 days in this geometric model. (Or
   nearly so, 11 days is what you get with these rounded numbers.)
7. That means after one year, the maintenance required
   for 100 lines of work is shrunk to 3 lines of effort per month. After five
   years, it’s down to half a line of effort per month. After ten years, it’s
   barely noticeable, at a twentieth of a line per month.